Send Message
products
Home / Products / Rock Loader /

Electric Mining Tunnel Rock Loader Coal Mucker Mining Mucker Machine

Electric Mining Tunnel Rock Loader Coal Mucker Mining Mucker Machine

Brand Name: JCDRILLS
Model Number: Z-20W
MOQ: 1set
Price: Negotation
Payment Terms: T/T, L/C, D/P, Western Union, MoneyGram
Supply Ability: 2000pcs/Year
Detail Information
Place of Origin:
Beijing,China
Certification:
ISO,CE
Model Number:
Z-20W
Loading Capacity:
30-40m3h
Bucket Volume:
0.2m3
Track Gauge:
600mm
Power:
Electric Motor
Unloading Height:
1330mm
Weight:
3750Kgs
Bucket Power:
≥15
Walking Power:
10.5
Working Speed:
0.85m/s
Packaging Details:
Standard export package
Supply Ability:
2000pcs/Year
Highlight:

tunnel mucking machine

,

mining mucker machine

Product Description

Electric Mining Tunnel Rock Loader Coal Mucker Mining Mucker Machine

Z-20W Electric Mucker Mining Machine
Electric Mining Tunnel Rock Loader Coal Mucker Mining Mucker Machine 0
Application                                                                                                                                              
Z series Rock Loaders are designed as light,compact,flexible,easy operated and stable working equipment for underground mining,suitable for normal rocks,stones,grits,iron mine,gold mine,granite mine,and other metal or nonmetal mines.Maximum size of the loadable rocks can be 500mm diameter.And they gain highest efficiency by loading 100-400mm diameter rocks.They are suitable for level tunnels(8 degree maximum)for various underground mines.They are designed as' electric or compressed air driven,single bucketed and automatic walking machines by loading at front and unloading at back.Of which,Z-20 series electric rock loaders won the First Product Title of Shandong Province and National Mechanical Industry in recent years.Z-30W Rock Loader is the national patent product.
Introduction                                                                                                                                            
Z-20W electric bucket loader can be applicable to prospecting or excavation roadway with section (2.0m×2.2m) and horizontal or inclination angel less than 80°. The loaded materials include hard granite, iron ore and nonferrous metal ore, as well as general rocks, sands and salt particles. The maximum size of ores can be 500mm; however, the highest loading efficiency can be guaranteed if ore diameter is below 200mm.
Specification                                                                                                                                          

Type Z-17W Z-20W Z-20AW Z-30AW ZQ-26
Loading Capacity (m3/h) 20-30 30-40 30-40 50-60 40-50
Capacity(m3) 0.17 0.2 0.2 0.3 0.26
Loading Width(M) 1.7 2.0 2.0 2.2 2.7
Rail Gauge(mm) 600mm (When the rail gauge is 750mm,762mm, please mark in the order)
Power Electric motor Electric motor Electric motor Electric motor wind motor
Travel Power(kw) 10.5 10.5 10.5 1.5 10.5
Raising Hopper Power(kw) 10.5 10.5 13 15 15
Discharge Height(mm) 1250 1330 1360 1370 1250
Dimension(mm) Length (bucket down) L 2120 2480 2400 2620 2375
Width (pedal down) 1011 1210 1330 1300 1380
Height (bucket working) H2 1920 2180 2180 2260 2240
Height (bucket down) H1 1200 1518 1460 1545 1455
Weight(kg) 3760 3750 3700 4600 2700

 

 

Electric Mining Tunnel Rock Loader Coal Mucker Mining Mucker Machine 1

Packing& Delivery                                                                                                                                  
Electric Mining Tunnel Rock Loader Coal Mucker Mining Mucker Machine 2
Service                                                                                                                                                     
Electric Mining Tunnel Rock Loader Coal Mucker Mining Mucker Machine 3

Electric Mining Tunnel Rock Loader Coal Mucker Mining Mucker Machine 4
In our after sales service system, We establish perfect control system strictly according to ISO-9000 series, in this system, technology date and problem solve solution and preventive measures will be provided in any maintain project, all the spare parts will be used in new OEM products with installation instructions, packing list, manufacturer's instruction, qualification and Warranty certificate.
We provide "one equipment & one case, endless service, namely the after sales service begin from the order confirmation, last for the working life of the equipment.
Purchase Process                                                                                                                                 
Electric Mining Tunnel Rock Loader Coal Mucker Mining Mucker Machine 5     
FAQ                                                                                                                                                     
Q1. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q2. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q3. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q4. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q5. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q6: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from
.