Send Message
products
Home / Products / Borehole Drilling Rig /

300m Track Crawler Type ISO Well Drilling Equipment CWD300

300m Track Crawler Type ISO Well Drilling Equipment CWD300

Brand Name: JCDRILL
Model Number: CWD300
MOQ: 1Set
Price: Negotation
Payment Terms: T/T, L/C, D/P, Western Union, MoneyGram
Supply Ability: 2000 Set/Sets per Year
Detail Information
Place of Origin:
Hebei,China
Certification:
ISO,CE
Model Number:
CWD300
Dimension:
6300*2000*2450m
Driling Diameter:
105-450mm
Mud Pump:
BW250
Drilling Depth:
MAX.300
Weight:
8500KG
Supply Ability:
2000 Set/Sets per Year
Highlight:

300m well drilling equipment

,

300m water well drilling machine

,

iso well drilling equipment

Product Description

CWD300 Multi-functional track mounted water well drilling rig

CWD300 Multi-functional track mounted water well drilling rig is a efficient,multi-function full hydraulic water well drilling rig.It is high efficiency because of having a larger torque of the turntable and is mainly used for water well in industry and agriculture, national defense building foundation, geological exploration, geothermic well and other foundation working, it is popular at home and abroad.

 
CWD300 crawler mounted drilling rig can drilling in all kinds formations by mud drilling in soft formation and air DTH hammer in rock drilling,DTH Hammer is applied in rock drilling, slag is discharged by air pressure and the offstage efficiency is ten times than traditional rotary drilling.
 
CWD300 deep water well drilling rigs, in cutting drilling or rotary drilling can be operated in unconsolidated layer, and the slag can be discharged under by mud, the impact drilling operation can also be adopted and slag can be discharged by pressure air, the hydraulic water well drilling rig suitable for drilling complicated geological conditions.

Quality Products

Beautiful Price

Excellent Service

 

 

 

COMPACT DIMENSIONS

EXTENDING UNDERCARRIAGE
STRONGER FRAME
SIMPLE CONTROL
SEASY MAINTENANCE
VERSATILITY
water well drilling rig  CWD200 clawler mounted
water well drilling rig  CWD200 clawler mounted water well drilling rig  CWD200 clawler mounted water well drilling rig  CWD200 clawler mounted
Right elevation Left elevation Front elevation

 

PRODUCTS SPECIFICATION

300m Track Crawler Type Water Well Drilling Rig for Sale

PRODUCT CONFIGURATION

water well drilling rig  CWD200 clawler mounted water well drilling rig  CWD200 clawler mounted water well drilling rig  CWD200 clawler mounted
Famous Hydraulic Control Valve YUCHAI 70KW Engine High power hydraulic pump
water well drilling rig  CWD200 clawler mounted water well drilling rig  CWD200 clawler mounted water well drilling rig  CWD200 clawler mounted
High Hydraulic Support Leg Heavy Duty Rubber Crawler 1.5Ton Hydraulic Tool Winch

PRODUCTS LOADING

water well drilling rig  CWD200 clawler mounted

water well drilling rig  CWD200 clawler mounted water well drilling rig  CWD200 clawler mounted water well drilling rig  CWD200 clawler mounted

SUCCESSFUL PROJECT

300m Track Crawler Type ISO Well Drilling Equipment CWD300 15

FAQ

Q: Are you original manufacturer? Q: Which payment terms are available to us? Q: Which Incoterms 2010 terms can we work?

A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.

 

 

A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.

A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.

 

 

Q: How long will the delivery time take? Q: How about after sales service?

Q:Spare Parts When You Need Them

 

A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.

 

 

A: 365×24 Year-round Service
We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."

A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.

 

RELATED PRODUCTS

water well drilling rig  CWD200 clawler mounted water well drilling rig  CWD200 clawler mounted water well drilling rig  CWD200 clawler mounted

CWD400 Trailer Mounted

400m Water Well Drillling Rig

CSD200 Truck Mounted

200m Water Well Drilling Rig

JXY200 Vertical Spline

200m Water Well/Core Drilling Rig