Brand Name: | JCDRILL |
Model Number: | CSD400 |
MOQ: | 1set |
Price: | Negotation |
Payment Terms: | T/T, Western Union, L/C |
Supply Ability: | 3000sets/year |
JCDRILL Water Well Drill Rig
400m Truck mounted hydraulic water well drilling equipment
Application
CSD400 Multi-functional truck mounted water well drilling rig is a efficient,multi-function full hydraulic water well drilling rig.It is high efficiency because of having a larger torque of the turntable and is mainly used for water well in industry and agriculture, national defense building foundation, geological exploration, geothermic well and other foundation working, it is popular at home and abroad.
CSD400 truck mounted drilling rig can drilling in all kinds formations by mud drilling in soft formation and air DTH hammer in rock drilling,DTH Hammer is applied in rock drilling, slag is discharged by air pressure and the offstage efficiency is ten times than traditional rotary drilling.
Charactaristics
1.The drilling rias adopts the 6X4 special crane chassis of brand Sinotruck Howo and the main drive system, the transfer case, gearbox, double-winch unit, mud pump, turntable,drilling tower, feed system are set up on the chassis.
4.It's a hydraulicrotary drilling rig with directional circulation. It is equipped with BW450/2A mud pump which adopts the slurry as the washing fluid and can drill on clay, sand and rock if it is equipped with suitable drilling bit.
5.The power of drilling rig comes from a Cummins engine,132kw Cummins engine drives the large displacement high pressure plunger pump and it is characterized by powerful dynamic and stable performance.
6.The rotary head,have two gear,rotation speed is 0-80 and160rpm stepless adjustment and the rotary torque is 4800-9600Nm.
an
1 | Geology drilled | All kinds | |
2 | Drilling Type | DTH & Mud Rotary | |
3 | Drill system and operation | Hydraulic | |
4 | Hole Diameter | mm | Φ140—Φ350 |
5 | Hole Depth | m | 400 |
6 | Rotation aue | Nm | 9600 1st Gear |
4800 2nd Ger | |||
7 | Rotation Speed | rpm | 0-80 1st Gear |
0-160 2nd Ger | |||
8 | Drill pipe diameter | mm | 89/114 |
9 | Drill pipe length | mm | 4000/4500 |
10 | Axial pressure | T | 85KN |
11 | Max. Lifting force | T | 20 |
12 | Lifting force of Main winch(Optional) | T | 4 |
13 | Lifting force of hoist | T | 1.5 |
14 | Length of steel wire rope(tool winch) | m | 100 |
15 | Lifting height of tool winch | m | 8 |
16 | Diesel Engine type | CUMMINS | |
17 | Rated Horse power | Kw | 132 |
18 | Electrical System | 24 | Volt |
19 | Compressor Type | Rotary Screw/Movable | |
20 | Pressure Required | Mpa | 1.05—4.5 |
21 | Air consumption | m³/min | 16—60 |
22 | Manufacturer | SINOTRUCK HOWO | |
23 | Model | ZZ1257M5841W | |
24 | Engine | WD615.62 | |
25 | Rated Horse power | kw | 196 |
26 | Discharge Standard | EU-3 | |
27 | Drive type | 6*4 | |
28 | Max.Speed | Km/h | 102.9 |
29 | Steering wheel | left/right(Optional) | |
30 | Net Weight | T | 22 |
31 | Shipping Length | mm | 10500 |
32 | Shipping Width | mm | 2480 |
33 | Shipping Height | mm | 3050 |
34 | Working size(L*W*H) | mm |
11000*2480*7147 |
Package and Delivery
Standard sea transportation package or packed as customer's requirement
Our Services
In our after sales service system, We establish perfect control system strictly according to ISO-9000 series, in this system, technology date and problem solve solution and preventive measures will be provided in any maintain project, all the spare parts will be used in new OEM products with installation instructions, packing list, manufacturer's instruction, qualification and Warranty certificate.
We provide "one equipment & one case, endless service, namely the after sales service begin from the order confirmation, last for the working life of the equipment.
Certification
Delivery
FAQ
Q: Are you original manufacturer? | Q: Which payment terms are available to us? | Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.
|
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.
|
Q: How long will the delivery time take? | Q: How about after sales service? |
Q:Spare Parts When You Need Them
|
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
|
A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours." |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.
|
About us